A SmartLink is ready to scale only when traffic classification, routing, measurement and failure handling are all testable.
This checklist is designed for affiliates, media buyers, networks and technical operators. It is provider-neutral and can be applied to a network SmartLink, an AdsBridge implementation or a custom routing layer.
Mark each item as passed, failed or not applicable. A failed item should have an owner, corrective action and retest date.
Traffic definition
Eligibility
Routing logic
Tracking identifiers
Postbacks and events
Reporting and reconciliation
Quality and fraud control
Fallback and scaling
Audit output
| Finding | Owner | Priority | Corrective action | Retest date |
|---|---|---|---|---|
| Example: payout missing from postback | Tracking owner | High | Add payout macro and validate test event | YYYY-MM-DD |
Implementation support
Frequently asked questions
Can I use this checklist for AdsBridge?
Yes. The checks apply to AdsBridge and other tracking or SmartLink systems, although interface-specific steps will differ.
Do all forty checks have to pass?
Items may be not applicable, but every failure that can affect eligibility, attribution, compliance or revenue should be resolved before scaling.
How often should the audit be repeated?
Repeat after major routing, payout, offer, tracking or traffic-source changes, and periodically for high-volume systems.
Can you perform the audit independently?
Yes. The review can produce a risk register, corrected parameter map and prioritized implementation plan.
Contact
Describe the traffic, current routing or tracking setup, and the decision you need help making.
